JCB Power Systems
Download our case study with JCB.
When JCB needed engineers fast for the world's first hydrogen combustion engine, the timeline was tight and the stakes were high. This case study covers how 23 specialist engineers were placed across three business units — at speed, with precision, and driven entirely by referral and results.
"Chris’ first-hand experience of working as an engineer and being educated to degree level in mechanical engineering undoubtedly allowed him to understand the requirements of the engineering roles at JCB. This pace of recruitment support is greatly appreciated and allowed the recruitment project to process at speed and with the correct messaging.This was a critical time for JCB and the need to supply a high volume of quality candidates was pivotal to our project’s success. Having produced results efficiently and accurately, I had no hesitation in recommending Chris and Murray McIntosh to other areas of the business that were experiencing similar."
Matthew Round - Principal Systems Engineer at JCB Power Systems